Who this checklist is for

You need resin parts, and you need them before a date that's already too close. Maybe a production line is down, maybe a customer just doubled their order, or maybe the parts you received last week were dimensionally wrong and you're doing this all over again (ugh).

This checklist assumes you're ordering through JSP's customer portal and you have some flexibility on material but zero flexibility on timing. I've handled 300+ rush orders across my seven years in industrial supply, including same-day turnarounds for injection molding clients. The steps below are the ones I actually follow when I'm triaging an urgent request — not the ones you'd find in a training manual.

Six steps. Each one has a checkpoint. If you skip a checkpoint, you'll find out why it mattered at the worst possible moment.

The 6-step emergency resin parts checklist

Step 1: Log into the JSP portal — then check the fine print on your account

Head to the JSP website and log in. Standard stuff. But here's what most people miss: your account profile has fulfillment rules attached to it that can override the lead time you see on the product page.

I'm talking about things like approved shipping lanes, credit hold status, and — this one bites people — old purchase order templates with outdated delivery addresses. A while back, a client of mine logged in, placed a rush order, and everything looked fine. Except the order defaulted to a discontinued receiving dock address that hadn't been used since 2022. The shipment sat at the wrong facility for 36 hours before anyone caught it.

Checkpoint: Before you add anything to your cart, go to Account Settings > Fulfillment Rules and confirm your default shipping address, approved carriers, and current credit status. Takes 90 seconds. Saves you a day.

Why does this matter for emergency orders specifically? Because when you're in a hurry, the system assumes you've already verified this stuff. And when the system assumes, you get comfortable. And when you get comfortable, you forget to check whether the billing address on file matches your current PO. Which it doesn't. It never does.

Step 2: Confirm your polymer type — and yes, know what polyethylene actually is

This is where a lot of procurement folks get burned. They specify a material based on what they ordered last time, or what a colleague recommended, or what the customer vaguely described as "that plastic that's kinda flexible."

Let me save you the trouble. Polyethylene is a thermoplastic in the polyolefin family. Four variants matter for most industrial applications:

  • HDPE (high-density): Stiffer, more chemical resistant, good for load-bearing parts and tanks. Resin code 2.
  • LDPE (low-density): Softer, more flexible, used for films and liners. Resin code 4.
  • LLDPE (linear low-density): Tougher than LDPE, better tensile strength — common in stretch wraps and flexible lids.
  • UHMWPE (ultra-high molecular weight): Extreme wear resistance. If you're replacing a high-abrasion part, this is usually the answer.

Everything I'd read about material substitution said that if you're replacing an HDPE part, you should stick with HDPE. In practice, I've found that for low-load cosmetic parts, switching to LLDPE or even polypropylene often saves 15–20% without a meaningful performance difference. The catch is you need to document that decision so the engineer who reviews the order doesn't reject it.

Checkpoint: Write down the material designation and the reason you chose it. If the reason is "that's what we used last time," that's not a reason — that's a guess wearing a lab coat.

"An informed customer asks better questions and makes faster decisions."

I'd rather spend 10 minutes explaining the difference between HDPE and PP to a new procurement hire than deal with a rejected shipment three days later. The resin figures you specify are only as good as the material call behind them.

Step 3: Specify colored resin without a week of email ping-pong

"Blue" is not a color specification. Neither is "dark gray" or "like that other one we got before, you know the one."

If you need colored resin, you need one of these: a Pantone number, an RAL number, or a physical sample that you've already sent to the supplier. Anything less and you're inviting a round of back-and-forth that adds days to the timeline.

Here's the other thing about colored resin that nobody tells you upfront: the coloring method affects the material properties. Masterbatch coloring (adding color pellets during molding) is cost-effective and flexible, but it can reduce tensile strength by 5–10% depending on the pigment load. Pre-compounded color — where the resin comes pre-colored from the supplier — costs more but keeps the properties consistent.

I went back and forth between masterbatch and pre-compounded for about two weeks on a medical device housing project. Masterbatch offered a 30% cost savings; pre-compounded had the certification documentation the client needed. Ultimately chose pre-compounded because the client's regulatory review would have rejected masterbatch without expensive testing. The savings weren't worth the risk.

Checkpoint: If color accuracy matters, ask for a color chip approval before production. Most JSP suppliers will ship a physical chip for under $50 and 2–3 business days. That's cheaper than scrapping a batch.

Step 4: Define your resin figures with tolerances — not just a 3D file

Sending a STEP file and calling it a day is the most common mistake I see on custom resin parts. The file tells the machinist the nominal shape. It doesn't tell them which dimensions are critical and which are cosmetic.

You need a 2D drawing with tolerances on it — even a rough one. Mark the dimensions that have to be exact (mating surfaces, bore diameters, mounting hole positions) and the ones that can float (cosmetic radii, draft angles, non-critical wall thicknesses).

Here's a decision that trips people up: do you spec the part to the OEM drawing, or to the measured dimensions of the failed part? I've done it both ways. OEM drawings are theoretically correct but often reflect a different revision than what's actually on the machine. Measured dimensions work great if the old part hasn't worn or deformed. Neither is universally right.

Checkpoint: Include a marked-up drawing with at least three critical dimensions flagged. If you don't have one, ask the supplier which dimensions they plan to inspect, and confirm those match your functional requirements.

Step 5: Choose the rush level — and understand what you're actually buying

Most suppliers offer two or three tiers: standard (5–10 days), expedited (2–3 days), and emergency (24–48 hours). The price jumps are significant — I've seen expedited fees run 25–50% over standard, and emergency fees hit 100–200%.

But here's the thing: "24-hour turnaround" means different things depending on who you ask. Sometimes it means production starts within 24 hours. Sometimes it means the part ships within 24 hours. Sometimes it means you get an email confirming the order within 24 hours and the actual part takes five days (ask me how I learned this).

Get the clarification in writing. Which clock starts when? Does the clock include weekends? What happens if the order confirms at 4:58 PM on Friday?

Checkpoint: Before you pay the rush fee, get a written confirmation that states: (a) the date and time production starts, (b) the date and time the part ships, and (c) the carrier and service level. If any of those three are vague, the rush fee is a donation.

Step 6: Lock the order and build a backup plan you won't need

You've verified the account, specified the material, nailed down the color, defined the tolerances, and paid for the rush. Now confirm the order in writing — not just the portal confirmation screen, but an email from a human that says the ship date and quantity you expect.

And then do the thing that feels pessimistic: identify a single batch-split option. If the supplier can produce 50% of your quantity by the deadline and 50% two days later, that's dramatically better than 100% arriving three days late. Ask about this before you need it.

The conventional wisdom is that you should always have a second supplier vetted and ready. My experience with 300+ rush jobs suggests that for resin parts with specific color or tolerance requirements, qualifying a second source takes 2–3 weeks minimum — which defeats the purpose of an emergency order. A better use of that time is negotiating a batch-split contingency with your primary supplier.

Checkpoint: Ask this question verbatim: "If your production runs behind schedule, can we ship the completed units first and the balance later?" If the answer is yes, put the split percentage and ship dates in the order notes.

Common mistakes that sink emergency orders

Assuming "in stock" means "available for your quantity." A product page might show 10,000 units available, but those can be allocated to existing orders. Check the actual available-to-promise quantity, not the on-hand quantity.

Skipping the color chip. I've never once regretted waiting 2 days for a physical color sample. I've regretted skipping that step three times, and each time cost at least a week.

Forgetting that rush fees are negotiable on large orders. At 500+ units, the "standard" rush fee is a starting point. It's not advertised, but most suppliers will discount the expedite fee by 15–25% for volume. All you have to do is ask.

Using the wrong polyethylene variant because it was cheaper. HDPE and LDPE differ by roughly 10–15% in price for similar volume. That difference evaporates the moment a part fails in service and you're eating the replacement cost plus the downtime. Match the polymer to the application, not to the invoice.

Not checking the JSP website for revised lead times. Lead times change. The portal's public-facing product pages often show different delivery estimates than what your account actually sees after login. Trust the logged-in view, not the marketing page (this was true as of January 2025, at least — verify it on your next order).

The bottom line: emergency orders fail because of small skipped steps, not big dramatic mistakes. Run the checklist. It takes 15 minutes. That's cheaper than a missed deadline.

Dow Corning Technical Desk